IPG Open EdX Documentation

IPG Open EdX Documentation

  • Docs

›Running a Course

Creating a Course

  • Create a New Online Course
  • Set Course Schedule & Details
  • Add Sections, Subsections & Units
  • Managing Unit and Component
  • Adding Videos
  • Adding HTML
  • Adding Discussions
  • Adding Problems

    • Adding Problems
    • Problem Types
    • Drag and Drop
    • Pointing on a picture
  • Adding Images and Figures
  • Uploading Static Content
  • Course Visibility
  • Creating pages
  • Grading
  • Commonly Used Advanced Settings

Running a Course

  • Managing Certificates
  • Common Instructor Dashboard Tasks
  • Managing Course Discussions

Advanced Management

  • Importing / Exporting Courses
  • Change a user’s password
  • Inactivate / Activate a User
  • Set a user to staff or superuser
  • Server Tasks

    • SSH into Server
    • Set or Change a Password
    • Add a microsite
    • Add a theme

Migration

  • Migrate EdX (Single-Server)
  • Migrate the Theme

Configuration

  • Enable and Update Additional Languages
  • Enable Downloads from Instructor tab in LMS
  • Configure and Enable Certificate
  • Configure Open Response Assessment

Common Instructor Dashboard Tasks

Each course has an instructor dashboard which is only visible to staff and instructors on a course. This dashboard allows staff to work with information about enrollment, grading, and more.

Accessing the Dashboard

  1. Log into your LMS instance

  2. Select a course from your dashboard

  3. From the top menu, select the ‘Instructor’ tab. If the Instructor tab is not available, then it is most likely that you haven’t been assigned as an instructor for that course.

    Instructor Tab

Course Info

Course Info shows the number of enrolled students, course details, and the minimum passing grade. In the following image, a course has 5 total students and the minimum passing grade is 50%. Enrollment Information Image needs to be updated

Membership

From Membership, you can enroll or unenroll students and staff in your courses.

  1. Batch Enrollment – To enroll multiple students, enter their e-mail addresses separated by commas. If a user is not registered on the platform, they will receive an e-mail inviting them to sign up. Batch Enrollment Image needs to be updated

  2. To add or remove staff members, use the studio functionality.

Student Admin

Student admin allows for several semi-common tasks, like checking the gradebook and adjusting grades.

  1. Checking the gradebook.

    1. Select View Gradebook.

    View Gradebook

    1. Grades are shown for all enrolled students. You can search for a particular student by username.
  2. To view a student’s specific progress.

    1. Enter the name of the student in the Student-Specific Grade Inspection Box and click ‘Student Progress Page’

    Student Grade Inspection Image needs to be updated

    1. You will be brought to that student’s current progress report.

    Student Progress Report

  3. To change a student’s grade or problem state.

    1. Enter the student name.

    2. Enter the problem.

      1. When logged in as an instructor, you can navigate to a problem and see a button for ‘Staff Debug’.

      Staff Debug Information

      1. From the Staff Debug view, you can copy a problem’s location.

      Staff Debug View Image needs to be updated

    3. Select an appropriate action, from the three choices.

      1. Reset Student attempts – If a student has maxed out the number of attempts on a problem (e.g. 3 attempts of 3 allowed attempts), then this will reset their number of attempts (e.g. 0 attempts of 3 allowed attempts).
      2. Rescore Student Submission – This will not allow the admin to set a score (e.g. 5 points out of 5). This will simply trigger the computer to rerun the scoring algorithm for that problem. Used in the rare case that problem was scored wrong, or changed after a student was scored, and thereby deserves a different score.
      3. Delete student state – This will reset any student answers, score, and attempts on a problem.
← Managing CertificatesManaging Course Discussions →
  • Accessing the Dashboard
    • Course Info
    • Membership
    • Student Admin
IPG Open EdX Documentation
Docs
Create an Online Course
More
Curricu.me Website
Copyright © 2020 Todos los Derechos Reservados - IPG